Skip to main content

Initialisation

Initialisation is the first tab of the risk analysis. It presents in read-only mode the context from pre-qualification, so that you can check it is complete before launching the generations.

The role of initialisation

This tab does not require any input. It serves as a checkpoint: you review the key elements of pre-qualification and ensure nothing is missing before moving to the following steps.

If you spot any missing or incorrect information, go back to pre-qualification to fix it before continuing.

AICT levels

The first block recalls the AICT levels (Availability, Integrity, Confidentiality, Traceability) from the pre-qualification summary.

The levels are presented on four tiers (Low, Medium, High, Very high). They will guide the AI in generating feared events and risks.

LevelBadgeQuick reading
Low🟢 LowLow stake — minimal vigilance
Medium🟡 MediumModerate stake — standard measures
High🟠 HighStrong stake — increased vigilance
Very high🔴 Very highCritical stake — top priority

Project assets

The second block lists the assets linked to the project during pre-qualification. These assets constitute the material and logical scope of the analysis.

Each asset is presented with its name and type. To modify this list, go back to pre-qualification in the Assets subsection.

Project processes

The third block lists the business processes identified in pre-qualification. They will notably be associated with feared events to characterise their impacts.

tip

Use this tab to validate one last time the consistency of the scope. A well-initialised context guarantees better-quality generations at the next step.

Move to the next step

Once the context is checked, move to the Feared events tab to launch the first generation of the analysis.